V2

Vision 2 Home

Akron · Cleveland

A renovated open-plan kitchen with warm wood cabinetry and stainless counters

Now booking

Akron & Cleveland

Renovation · done right

Renovations built to outlast the trend cycle.

From kitchen overhauls to full gut rebuilds, we bring honest work and steady timelines to homes across Akron and Cleveland.

2

Metro areas served

5

Core service lines

1

Direct crew

What we do

(a) — Services

01

Kitchen Remodels

Layout, cabinetry, and finishes reworked around how you actually cook.

02

Bathrooms

Waterproofing, tile, and fixtures done to last a full renovation cycle.

03

Basements & Additions

Living space below grade, framed, insulated, and finished out.

04

Full Gut Reworks

Structural to finish, with a clear scope and a held schedule.

05

Exterior & Windows

Siding, trim, and replacement windows that weather the Northeast.

Recent work

(b) — On site now

Full bathroom gut & replumb

Part 1 — Demo down to the joists, new drain and supply rough-in.

In progress
Bathroom gutted to the joists with subfloor opened up
New plumbing lines run beneath the opened bathroom floor
New PVC drain lines fitted between floor joists
Fresh drain piping and fittings laid out during rough-in
Wall opened for plumbing access behind the vanity
Toilet flange and supply lines set during rough-in
Floor opened along the wall for new plumbing runs
Drain and supply lines crossing the opened subfloor
Sink wall opened up with old flooring exposed
Original wall cavity exposed during demolition

Same project, one week later

Part 2 — Tub wall framed, plumbing roughed in, drywall hung, and the new vanity set.

In progress
New tub wall framed with shower valve and copper riser installed
New vanity and medicine cabinet set with fresh drywall behind
Drywall hung on the new bathroom walls
Drain, vent, and supply lines roughed in under the floor
Tub plumbing wall framed and partially drywalled
New vanity placed in the rebuilt bathroom
New vent stack tied into the existing cast iron line
Vent and drain lines run through the opened wall
Fresh drywall on the rebuilt partition wall
New bathtub on site ready for installation

Walls closed up, finish underway

Part 3 — New drains in, old stack tied in, and drywall closing up the rebuilt walls. Watch the walkthrough clips below.

In progress
New drain piping run beneath the opened floor
Doorway and wall framing opened during the rebuild
Old cast-iron stack exposed and tied in
Fresh drywall closing up the rebuilt walls

Walkthrough — demo day

Walkthrough — rough-in

Walkthrough — framing

Walkthrough — walls going up

(c) — Service area

Two metros. One standard.

We work across the Akron and Cleveland metro areas, so a familiar crew stays close to your project from first walkthrough to final coat.

Akron, OHCleveland, OH
Aerial view of Ohio neighborhoods at dusk

(d) — Talk it through

Ready to start your renovation?

Call or email for a straightforward conversation about scope and timing.